Factory Audit

Find out what the factory can really do

A structured, on-site assessment of a manufacturer's quality system, production capability and compliance — carried out for the buyer, before money and tooling are committed.

Overview

What a factory audit actually establishes

A certificate on a supplier's wall tells you that a system was once assessed. An audit tells you whether that system is operating on the day you visit: whether incoming materials are checked, whether measuring devices are calibrated, whether a nonconforming batch can be traced and isolated, and whether the line that made your sample is the line that will make your order.

Our audits are scored against a weighted checklist derived from ISO 19011 audit principles, ISO 9001:2015 clauses and, where relevant, sector standards such as IATF 16949, ISO 13485, ISO 22000 or BRCGS. The output is a decision document, not a souvenir.

When you need it

When you need it

01

Before placing a first order with a new supplier, or before releasing tooling and deposits.

02

When a supplier's certificate, capacity claim or export history needs independent verification.

03

After repeated defects, late shipments or a failed inspection, to find the systemic cause.

Scope of work

Scope of work

01Quality management system

Document control, procedures versus actual practice, internal audits, management review, complaint handling and corrective action closure.

  • ISO 9001:2015
  • ISO 19011
  • 8D / CAPA
  • Management review

02Incoming material & supplier control

Approved vendor lists, incoming inspection records, material certificates, storage conditions and subcontracting disclosure.

  • IQC
  • Approved vendor list
  • CoA / material certs
  • Subcontracting

03Process control & traceability

Work instructions, in-process checkpoints, control plans, lot identification, rework rules and segregation of nonconforming product.

  • Control plan
  • IPQC / FQC
  • Lot traceability
  • NCR segregation

04Capability, capacity & equipment

Real line count, cycle time, maintenance records, calibration status, OEE evidence and the ability to hold your volume without subcontracting.

  • OEE
  • Cycle time
  • Calibration / MSA
  • Maintenance logs

05Compliance & social responsibility

Fire safety, chemical management, worker welfare and working hours against BSCI, SMETA, SA8000 or RBA criteria, plus C-TPAT-style supply-chain security where required.

  • BSCI / SMETA
  • SA8000 / RBA
  • C-TPAT
  • ISO 14001
Standards we work to

Standards we work to

Standard / frameworkScope of work
ISO 9001:2015 / ISO 19011Quality management systems and audit practice
IATF 16949Automotive quality management
ISO 13485 / GMPMedical devices, GMP and cleanroom control
ISO 22000 / HACCP / BRCGSFood safety, HACCP and hygiene
BSCI / SMETA / SA8000 / RBASocial compliance and responsible business
ISO 14001 / ISO 45001 / C-TPATEnvironmental and occupational health & safety
What you receive

What you receive

  • A weighted scorecard with a clear pass / conditional / fail conclusion and the section-by-section reasoning.
  • A photo-documented finding list, each item linked to the relevant clause or acceptance criterion.
  • A capability summary: verified equipment, lines, capacity, key processes and any undisclosed subcontracting.
  • A corrective action (CAPA) plan with owners, due dates and the evidence required for closure.

Note — red flags

  • Certificates that cannot be verified with the issuing certification body.
  • Records filled in with identical handwriting and ink, or dated on days the plant was closed.
  • A flawless sample line that is not the production line quoted for your volume.
  • Calibration labels past expiry, or no measuring equipment for the tolerances on your drawing.
How we work

How we work

01

Brief & scope

Your specification, order, target market and risk profile define the checklist.

02

Plan & preparation

Document review, sampling plan, auditor assignment and agreed acceptance criteria.

03

On-site execution

Evidence-based verification with photographs, measurements, record sampling and interviews.

04

Report & recommendation

A structured, photo-documented report with a clear pass / conditional / fail conclusion.

05

CAPA & follow-up

Corrective action plans, evidence review and re-verification before shipment or contract award.

Frequently asked questions

Frequently asked questions

How long does an audit take on site?
A standard quality-system and capability audit is a one-day visit for a small to mid-size plant; complex sites, multi-line facilities or social compliance audits may need two days. The plan is agreed before the visit.
Will the supplier know we commissioned the audit?
Yes — audits are conducted openly with the supplier's cooperation, because access to records, staff and the shop floor is essential. The commissioning party and commercial terms remain confidential.
What happens if the factory fails?
You receive the evidence and a conditional or fail conclusion with the critical findings called out. We then define a CAPA plan and can re-verify the closed items before any deposit or order release.
Related services

Related services

From the knowledge base

Request a Quote

Tell us what you need to verify

Send the product, supplier name, factory location and target shipment date. A specialist replies with scope, method and a quotation.