AQL is a threshold, not a quality level

The Acceptance Quality Limit is the worst tolerable process average expressed as percent nonconforming (or defects per hundred units). Choosing AQL 2.5 does not mean "2.5% defects are acceptable in my shipment". It defines the operating point of the sampling plan: lots at or better than that average are accepted with high probability, poorer lots are increasingly likely to be rejected.

Three inputs determine the sample

Lot size, inspection level and the sampling plan (single, double or multiple; normal, tightened or reduced). General Inspection Level II with single sampling under normal inspection is the usual commercial default. The lot size maps to a code letter, and the code letter to a sample size and to the acceptance (Ac) and rejection (Re) numbers for each AQL.

Worked example

A lot of 5,000 units under General Level II maps to code letter L and a sample of 200 pieces. At AQL 2.5 the acceptance number is 10 and the rejection number 11: up to 10 major defects and the lot passes, 11 or more and it fails. At AQL 4.0 for minor defects the limits are 14 and 15 against the same 200 pieces. Critical defects are normally set to Ac 0 / Re 1 by agreement.

Lot sizeCode letterSample sizeAc / Re at AQL 2.5Ac / Re at AQL 4.0
281 – 500H503 / 45 / 6
501 – 1,200J805 / 67 / 8
1,201 – 3,200K1257 / 810 / 11
3,201 – 10,000L20010 / 1114 / 15
10,001 – 35,000M31514 / 1521 / 22

Note: Illustrative extract only. The published standard, including its arrow rules and switching procedures, governs any actual sampling plan.

Switching rules matter

The standard is not a one-off table. A run of accepted lots can move inspection to reduced; a run of rejections moves it to tightened, which increases the chance of rejecting a marginal lot. Buyers who order a single inspection rarely see this benefit, but repeat programmes should specify the switching rule explicitly.

What sampling cannot do

Sampling risk is symmetric: a good lot can be rejected (producer's risk) and a poor lot accepted (consumer's risk). No AQL plan detects a latent defect with very low incidence, a systematic error affecting the whole lot, or a problem that only appears in transit or in use. Those risks are managed by process control, functional testing, lab testing and packaging tests — not by a larger sample alone.

Key takeaways

  • State the standard, inspection level, AQL per defect class and switching rule in the purchase order.
  • Fix critical defects at zero acceptance; never negotiate them down to "major".
  • Inspect when at least 80% of the lot is produced and packed, not before.
  • A pass verdict describes the lot, not a guarantee about every individual unit.