Start from the standard, not from a template
ISO 19011 sets the audit principles; ISO 9001:2015 clauses 4–10 supply the system structure. A sector framework then overrides the generic questions: IATF 16949 adds process audits and PPAP, ISO 13485 adds design controls and traceability, BRCGS adds hygiene and allergen segregation. A single 40-line checklist used for every factory is a warning sign.
Weight the areas that predict your risk
A weighted scorecard prevents a tidy reception area from compensating for absent traceability. Process control, incoming material control and nonconformance management usually carry the most weight for a manufacturing audit; social compliance dominates when a retailer's code of conduct is the driver.
| Audit area | Indicative weight | Evidence to request |
|---|---|---|
| Quality management system | 15% | Quality manual, internal audit reports, management review minutes |
| Incoming material & supplier control | 15% | Approved vendor list, IQC records, material certificates |
| Process control & traceability | 20% | Control plan, work instructions, in-process records, lot IDs |
| Capability, capacity & equipment | 15% | Equipment list, maintenance logs, calibration certificates, OEE data |
| Compliance & social responsibility | 10% | Fire-safety records, chemical registers, time & payroll records |
| Final inspection & complaint handling | 10% | FQC reports, complaint log, 8D reports, return analysis |
| Change control & engineering | 8% | ECN records, drawing revision history, approval sign-offs |
| Warehousing, packing & dispatch | 7% | FIFO records, packing lists, carton specs, shipping marks |
Follow the product through the building
The gemba walk runs in process order: goods-in, IQC, storage, production, in-process checks, final inspection, nonconforming stock, packing, finished-goods warehouse and dispatch. At each point, compare the written procedure, the record and what the operator actually does. A mismatch between those three is the finding.
Close with CAPA, not with a score
A number without owners and deadlines changes nothing. Every nonconformity should carry a root cause, a corrective action, a due date, an owner and the evidence that will be accepted at closure. Re-verification then checks those specific items rather than re-running the whole audit.
Key takeaways
- Agree the applicable standard and the audit scope before the visit.
- Sample records from different dates, shifts and operators.
- Photograph the finding, the surrounding context and the identification label.
- A single critical nonconformity overrides an otherwise high score.