Start from the standard, not from a template

ISO 19011 sets the audit principles; ISO 9001:2015 clauses 4–10 supply the system structure. A sector framework then overrides the generic questions: IATF 16949 adds process audits and PPAP, ISO 13485 adds design controls and traceability, BRCGS adds hygiene and allergen segregation. A single 40-line checklist used for every factory is a warning sign.

Weight the areas that predict your risk

A weighted scorecard prevents a tidy reception area from compensating for absent traceability. Process control, incoming material control and nonconformance management usually carry the most weight for a manufacturing audit; social compliance dominates when a retailer's code of conduct is the driver.

Audit areaIndicative weightEvidence to request
Quality management system15%Quality manual, internal audit reports, management review minutes
Incoming material & supplier control15%Approved vendor list, IQC records, material certificates
Process control & traceability20%Control plan, work instructions, in-process records, lot IDs
Capability, capacity & equipment15%Equipment list, maintenance logs, calibration certificates, OEE data
Compliance & social responsibility10%Fire-safety records, chemical registers, time & payroll records
Final inspection & complaint handling10%FQC reports, complaint log, 8D reports, return analysis
Change control & engineering8%ECN records, drawing revision history, approval sign-offs
Warehousing, packing & dispatch7%FIFO records, packing lists, carton specs, shipping marks

Follow the product through the building

The gemba walk runs in process order: goods-in, IQC, storage, production, in-process checks, final inspection, nonconforming stock, packing, finished-goods warehouse and dispatch. At each point, compare the written procedure, the record and what the operator actually does. A mismatch between those three is the finding.

Close with CAPA, not with a score

A number without owners and deadlines changes nothing. Every nonconformity should carry a root cause, a corrective action, a due date, an owner and the evidence that will be accepted at closure. Re-verification then checks those specific items rather than re-running the whole audit.

Key takeaways

  • Agree the applicable standard and the audit scope before the visit.
  • Sample records from different dates, shifts and operators.
  • Photograph the finding, the surrounding context and the identification label.
  • A single critical nonconformity overrides an otherwise high score.