Write the brief before searching
A usable brief fixes the specification, tolerances, annual volume, packaging, target landed cost, required certifications, destination-market regulations, Incoterms and your acceptance criteria. Without it, quotations are not comparable and "cheapest" becomes the only available comparison.
Verify the entity before the product
Business licence scope, registered capital, years of operation, shareholders, litigation, administrative penalties and the name on the bank account. A certificate is only evidence if its number, scope, validity and issuing body can be confirmed through an official database.
Compare total cost, not unit price
Normalise every quotation to the same basis: tooling and moulds amortised, packaging, certification and testing, inland freight, export clearance, inspection, expected rework, warranty and the cost of a delayed launch. A 7% unit-price advantage often disappears after these lines.
| Gate | Output that closes the gate |
|---|---|
| Requirement brief | Signed technical brief + acceptance criteria |
| Longlist & cluster mapping | Longlist with cluster and product-fit rationale |
| Legal & certificate verification | Verification dossier per candidate |
| RFQ & total-cost comparison | Normalised comparison matrix |
| On-site factory audit | Audit report, scorecard, CAPA plan |
| Sample approval & pilot order | Approved sample + pilot inspection result |
| Contract & quality agreement | Signed contract, quality agreement, KPI baseline |
Qualify on site, then with a pilot order
An audit proves capability; a pilot order proves repeatability. First-article approval, a controlled first batch and a documented inspection of that batch reveal whether the factory can hold the specification at volume, not just for a hand-made sample.
Key takeaways
- Never release tooling or a deposit before the legal entity and certificate checks close.
- Keep at least two qualified sources for any critical component.
- Put change control, traceability and 8D response into the quality agreement.
- Monitor OTIF, defect rate and CAPA closure after the first three orders.