01Quantity & assortment
Carton count, units per carton, open-carton verification, size / colour / model distribution against the PO.
A statistically valid random inspection of finished goods against your specification and acceptance criteria, performed at the factory before shipment, with a documented verdict the same day.
Under ISO 2859-1 (ANSI/ASQ Z1.4, GB/T 2828.1) a random sample is drawn from the finished lot. Defects are classified as critical, major or minor and compared with the acceptance numbers for your chosen AQL and inspection level. The result is a decision about the lot, based on a defined and reproducible sampling risk.
An AQL inspection is not a guarantee that every unit is perfect, and it cannot detect a latent defect that no sample would reveal. That is why we combine the statistical check with functional testing, packaging and labelling review, and — where risk warrants it — loading supervision or 100% sorting.
Before the final balance payment, when at least 80% of the order is produced and packed.
After a supplier changed material, tooling, sub-supplier or production line mid-order.
When your destination market requires documented compliance checks (CE, UKCA, FCC, CPSIA, RoHS, REACH).
Carton count, units per carton, open-carton verification, size / colour / model distribution against the PO.
Surface defects, seams, finish, colour consistency against approved samples and a defined viewing distance and lighting.
Assembly, on/off cycles, electrical safety checks, load or drop tests where applicable, measurements against drawing tolerances.
Barcode scan (GS1), artwork and spelling, warning labels, shipping marks, carton strength, drop test and moisture protection.
Declaration of Conformity, test reports, CoC, MSDS, traceability labels and the applicability of CE / UKCA / FCC / RoHS / REACH / CPSIA marks.
| Standard / framework | Scope of work |
|---|---|
| ISO 2859-1 | Sampling procedures for inspection by attributes |
| ANSI/ASQ Z1.4 | US national counterpart to ISO 2859-1 |
| GB/T 2828.1 | Chinese national adoption of ISO 2859-1 |
| ISTA / ASTM D4169 | Transit packaging performance testing |
| Critical / Major / Minor | Defect classification, critical / major / minor |
| Ac 0 / Re 1 (critical) | Zero acceptance for critical defects |
Your specification, order, target market and risk profile define the checklist.
Document review, sampling plan, auditor assignment and agreed acceptance criteria.
Evidence-based verification with photographs, measurements, record sampling and interviews.
A structured, photo-documented report with a clear pass / conditional / fail conclusion.
Corrective action plans, evidence review and re-verification before shipment or contract award.
Send the product, supplier name, factory location and target shipment date. A specialist replies with scope, method and a quotation.